Viewing a Project in TaskRay View

Contents

Purpose
Viewing a Project in TaskRay View
Viewing Project Tasks
Kanban View
Row View
Plan View
Calendar View
List View
View Task Details
Revision History

Purpose

Projects can be viewed in two ways; within Salesforce, which is the most common tool, and within TaskRay which is the Services module for Salesforce.

This document walks the user through how to open and view a project in the TaskRay view vs the Salesforce view. It provides a high-level overview of each of the view types.

Top of Document

Viewing a Project in TaskRay View

To create a recurring task, you will first need to open the project in the Task Ray view:

  1. From the Menu bar in Salesforce, select TaskRay
  2. Select the ‘All Work’ tab

Graphical user interface, application  Description automatically generated

  1. Enter the project name in the project box or select it from the project list

Graphical user interface, application  Description automatically generated

  1. The Project information box will open for review/modification as necessary

Graphical user interface, text, application  Description automatically generated

Top of Document

Viewing Project Tasks

There are several different views for project tasks within the TaskRay project view:

  • Kanban View
  • Row View
  • Plan View (or Gantt View)
  • Calendar View
  • List View

From any view, the task can be double-clicked to open, view, and modify the task details.

To select the preferred view:

  1. Select the appropriate icon from the ‘All Work’ section

Graphical user interface, application  Description automatically generated


Icon  Description automatically generated with medium confidence
Top of Document

Kanban View 

Kanban View is grouped by task status:

Graphical user interface, text, application, email  Description automatically generated

You can move the task from one status to another by selecting the task and either using the arrow key to move to the next/previous list or by dragging and dropping to the appropriate status column
You can also select the task sorting method by selecting the ‘Whiteboard Sort’ drop-down option you prefer

Graphical user interface, text, application  Description automatically generated

Top of Document

Row View

In Row View, the tasks are shown based on the option selected in the Whiteboard Sort option. Here it is shown by the Estimated End date, showing tasks that are late vs upcoming:

Graphical user interface, application  Description automatically generated

Top of Document

Plan View

Plan View provides a Gantt view for the project, where project tasks are shown via a timeline along with task dependencies.

Graphical user interface  Description automatically generated

Top of Document

Calendar View

This view provides visibility within a calendar:

Graphical user interface  Description automatically generated

It can be exported or printed by clicking the download icon at top right of screen.

Top of Document

List View

This view shows tasks in a list and allows the quick addition of a new task:

Table  Description automatically generated

Top of Document

Viewing Task Details

From any view, double-click a specific task to open, view, and modify the task details:

Graphical user interface, text, application, email, Teams  Description automatically generated
Top of Document